
Case study
Beyond Start and Stop: Designing a Fault-Aware Pump Control System
An automated pump-control prototype developed to manage water-pumping cycles while monitoring operating conditions and responding to faults.
Stories
Each one describes the situation, the engineering, and what the site does now that it did not before. Where a client is not named, that is a decision the client made, and it is stated rather than glossed.

Case study
An automated pump-control prototype developed to manage water-pumping cycles while monitoring operating conditions and responding to faults.

Case study
A remote water-tank monitoring system developed to measure water levels, transmit readings over a wireless connection, and provide visibility into tank status without requiring someone to inspect the installation manually.

Case study
An electrical energy-monitoring prototype developed to measure consumption across individual circuits, distinguish the loads contributing to total electricity use, and present the measurements through a central dashboard.

Case study
An industrial data-integration prototype developed to collect measurements from a Modbus-enabled device and present them through a centralized dashboard.
Describe the situation. Helena will tell you what it would take to understand it properly before anyone discusses cost.